White Oak Cogeneration Plant
Engineering and Design Project

Engineering and design for the expansion to an existing 5 MegaWatt cogeneration plant. The expansion included the addition of a Mercury 50 Gas Turbine Generator with waste heat recovery tied into an existing medium temperature hot water heating plant. The project also included the installation of 2,000 tons of chiller capacity. This is the first phase of a multi-phase project that will include an additional 4 Mercury 50 Gas Turbine Generators and the expansion of the chiller plant to a total capacity of 14,000 tons.